Progress ReportPrice sensitive01 September 2026

Higher Copper Recoveries For Horden Lake

Pivotal Metals reported Phase 2 metallurgical testwork results for its Horden Lake Copper Project in Quebec, showing improved copper recoveries above 90% into a clean, high-grade concentrate along with nickel, gold, silver, palladium, platinum and cobalt by-product credits. The results will inform the company's in-progress scoping study, due in September 2026.

Download PDF
Progress ReportPrice sensitive20 August 2026

Bambino Deal Expands High-Grade Cu-Ni-PGM at Belleterre

Pivotal Metals has entered an option agreement to acquire 100% of the 57-claim, 3,320-hectare Bambino Project in Québec, which surrounds its existing Delphi Patry and Zullo occurrences and consolidates the Midrim-Zullo trend of high-grade Cu-Ni-PGM occurrences. Consideration is C$125,000 cash, 9,615,000 shares and $500,000 of exploration work over three years, with a 2.0% NSR retained by the vendors. Surface geophysics is planned from September ahead of possible drilling in the fourth quarter, while drilling continues at the Lorraine mine.

Download PDF
Quarterly Activities ReportPrice sensitive30 July 2026

Quarterly Activities/Appendix 5B Cash Flow Report

Pivotal Metals reported a large increase in its Horden Lake copper resource (52 Mt at 1.05% CuEq) and continued drilling at its Belleterre exploration projects in Québec during the June 2026 quarter, including high-grade nickel-copper-PGM results at Alotta. The company held a cash balance of $3.482m at quarter end and is progressing a Scoping Study for Horden Lake expected by the end of Q3 2026.

Download PDF
Price sensitive07 July 2026

Major Copper Resource Growth at Horden Lake

Pivotal Metals reported a major increase in the Mineral Resource Estimate at its Horden Lake copper-nickel-gold-PGM-cobalt project in Quebec, Canada, growing the total resource by 42% to 52 Mt at 1.05% CuEq (549 kt CuEq) and the pit-constrained open pit resource by 46% to 45 Mt at 1.07% CuEq (485 kt CuEq). The growth was driven by drilling geophysical EM conductors, and the deposit remains open along strike and at depth with further undrilled conductive targets identified. The updated MRE is intended to underpin a Scoping Study planned for Q3 2026.

Download PDF
Price sensitive02 July 2026

Drill Program Expanded at Belleterre

Pivotal Metals has expanded its Belleterre diamond drilling program in Québec by an additional 1,500m, targeting eight never-drilled IP-defined copper-nickel and gold anomalies at Lorraine Mine East, adjacent to the past-producing Lorraine Copper Mine. The current 1,800m program is nearing completion, with hole 26-PIV-08 at 420m, approximately 150m from the Shanty Lake FLTEM conductor target. A Horden Lake Mineral Resource update and scoping study are expected before the end of Q3 2026.

Download PDF
Price sensitive10 June 2026

High grade Cu, Ni and PGM Intersected in Alotta Drilling

Pivotal Metals reported the first assay results from its maiden drill program at the Belleterre Projects in Québec, with drilling at the Alotta target intersecting high-grade copper-nickel-PGE sulphide mineralisation, including 21.8m @ 1.3% Ni, 1.0% Cu & 1.3 g/t 3PGE from 73m. The company also outlined ongoing exploration across the Belleterre corridor and an updated work program for its 100%-owned Horden Lake copper deposit, including a mineral resource update and scoping study targeted for Q3 2026.

Download PDF
Price sensitive14 May 2026

Exploration of New Cu-Ni Targets Commences at LaForce

Pivotal Metals has commenced a maiden modern field exploration program at the LaForce Cu-Ni target within its 100%-owned Belleterre portfolio in Québec, Canada. The program follows reinterpretation of historical drilling and geochemical data that identified multiple new undrilled priority targets, with field validation and EM surveys planned ahead of potential 2026 drill testing.

Download PDF
Price sensitive30 April 2026

Quarterly Activities/Appendix 5B Cash Flow Report

Pivotal Metals reported quarterly exploration progress across its Belleterre (Québec) copper-gold-nickel exploration projects and its Horden Lake copper-nickel-PGM development project, including commencement of maiden drilling at Belleterre, new gold-copper targets identified via IP survey and fieldwork, encouraging ore sorting and flotation testwork at Horden Lake, and an in-progress resource update and scoping study. The Company held a cash balance of $4.44m at 31 March 2026.

Download PDF
Price sensitive28 April 2026

Horden Lake Strategy Update

Pivotal Metals has outlined its strategy for advancing the 100%-owned Horden Lake Cu-Ni-Au-PGM-Co Project in Québec, with a Mineral Resource update (Q2 2026), scoping study (Q3 2026) and further metallurgical testwork all in progress. The resource update will incorporate 2025 step-out drilling that extended sulphide mineralisation 600m along strike and is not included in the existing 37Mt @ 1.1% CuEq (407kt CuEq) 2025 MRE. Maiden drilling at the Belleterre projects has completed 906m, with first assays expected in May.

Download PDF
Price sensitive31 March 2026

New Horden Lake Metallurgical Program Targets Value Uplift

Pivotal Metals has commenced Phase 2 metallurgical testwork at its 100%-owned Horden Lake Cu-Ni-Au-PGM-Co project in Quebec, aimed at improving nickel and precious metal recoveries and de-risking the flotation flowsheet. The program is being run at Blue Coast Research, is scheduled for completion by end of Q2 2026, and is supported by up to 50% co-funding under a Québec critical minerals grant. Drilling is also underway at the Belleterre projects, with assays expected progressively during Q2.

Download PDF
Price sensitive26 February 2026

Drilling to Commence at Belleterre High-Grade Cu Targets

Pivotal Metals is set to commence an initial 1,500m diamond drilling program at its 100%-owned Belleterre projects in Québec, Canada, starting at the Midrim area with mobilisation expected next week, before moving on to the Lorraine project area. The company reports $5.5M cash as at 31 December 2025 and highlights the drilling as testing new untested targets beyond historic drilling footprints.

Download PDF